PennDOT has announced the following road projects, which are weather-dependent and could affect residents in the greater Chadds Ford area during the week of Feb. 16-Feb. 22. Motorists are urged to allow extra time if they are traveling through one of the construction zones. Work schedules are subject to change.
• Bridge inspection will cause lane restrictions on Route 1— between Lenape Road and Greenwood Road — in Kennett Township on Feb. 18 and 19.
• Route 3, West Chester Pike, between S. Matlack Street and High Street, will be closed for utility installation between Jan. 7 and Feb. 28.
• The Route 82 — Creek Road — bridge in Kennett Township remains closed indefinitely.
• Barrier installation continues to cause indefinite lane closures on Brandywine Creek Road, between Green Valley and Powell roads, in Newlin Township.
• Lane restrictions on the Conchester Highway, between Routes 1 and 261 will continue through Oct. 20, 2020, for reconstruction and widening.
• Road reconstruction will close Spring Valley Road— between Conchester Highway and Concord Road — in Concord Township from Jan. 17 through April 30, 2020. Detours will be posted.
• Merion Drive in Concord Township, between Marlborough Lane and Cambridge Drive, will be closed and detoured from Dec. 3 to April 30 for reconstruction.

Deprecated: Automatic conversion of false to array is deprecated in /var/www/vhosts/chaddsfordlive/public_html/wp-content/plugins/wp-postratings/wp-postratings.php on line 111
Deprecated: Automatic conversion of false to array is deprecated in /var/www/vhosts/chaddsfordlive/public_html/wp-content/plugins/wp-postratings/wp-postratings.php on line 1213
Comments