Roadwork for week of Jan. 21

PennDOT has announced the following road projects, which are weather-dependent and could affect residents in the greater Chadds Ford area during the week of Jan. 21 through Jan. 27. Motorists are urged to allow extra time if they are traveling through one of the construction zones.

PennDOT logo• On Saturday, Jan. 21, from 6 a.m. to 2 p.m., Creek Road will be closed and detoured between Route 1 and Brinton’s Bridge Road in Birmingham Township, for drainage pipe replacement. The posted detour will be Brinton’s Bridge Road, Route 202 and Route 1.

• Green Valley Road, between Powell and Brandywine Creek roads, in Newlin Township, remains closed for bridge repair. Detours are posted.

• Route 82, Doe Run Road in East Fallowfield, between Valley and Strasburg Roads will be closed for bridge repair until sometime in June. Detours are posted.

• Utility installation will cause lane restrictions on Paoli Pike at Long Lane in West Goshen Township on Jan. 26 and 27. Work will take place between 9 a.m. and 3 p.m.

• Utility installation will also cause lane restrictions on Route 100 North, between Crosspoint Drive and Taylor’s Mill Road, in West Goshen Township, between Jan. 23 and 27.

About CFLive Staff

See Contributors Page https://chaddsfordlive.com/writers/


Deprecated: Automatic conversion of false to array is deprecated in /var/www/vhosts/chaddsfordlive/public_html/wp-content/plugins/wp-postratings/wp-postratings.php on line 111

Deprecated: Automatic conversion of false to array is deprecated in /var/www/vhosts/chaddsfordlive/public_html/wp-content/plugins/wp-postratings/wp-postratings.php on line 1213
1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading...

Comments

comments

Leave a Reply