Road Report February 16 – 27

PennDOT has announced the following weather-dependent road projects that could affect drivers in the greater Chadds Ford area from Feb. 16 to Feb. 20. Motorists are urged to allow extra time traveling through one of the construction zones. Work schedules are subject to change.
- From Monday, Feb. 16, through Friday, Feb. 27, motorists will encounter daytime lane closures at the intersection of Routes 202 and 926 in Westtown Township. PennDOT’s contractor will install a new southbound right-turn deceleration lane on Route 202 at the Route 926 intersection. An additional eastbound left-turn lane will be installed on Route 926, creating a double left-turn configuration along the eastbound approach to the intersection with 202.
Overhead sign installation will cause periodic 15-minute stoppages overnight, from 7 p.m. to 5 a.m. on Route 1 in both directions between Schoolhouse Road and the Kennett Oxford Bypass on Feb. 19 and 20.- Tree trimming will cause daytime lane closures of Lenape Unionville Road between Route 52 and Red Lion Road in Pocopson Township through Feb. 27
- Overhead utility work will cause daytime lane shifts on Kennett Pike between Ashford Drive and Cossart Road in Kennett and Pennsbury townships through March 6.
- Boardwalk construction will cause daytime lane closures between Baltimore Pike and Upper Bank Drive in Chadds Ford Township through Feb. 27.
- Tree work will cause daytime lane closures on Route 162 (Embreeville Road) between Scott and Stargazer roads in Newlin Township through Feb. 21.
- Meter relocation will cause daytime lane closures on Route 52 (Price Street) at S. Church Street in West Chester through Feb. 23.
- Tree trimming will cause daytime lane closures on E. Street Road between E. Doe Run Road and School House Road in East Marlborough Township through Feb. 27.
- Tree trimming will cause daytime lane closures on Lenape Road between W. Lafayette Drive and E. Street Road in Pocopson, East Marlborough, and Pennsbury townships through Feb. 27.
- Tree trimming will also cause daytime lane closures on Wawaset Road between County Prison Farm and Route 52 in Pocopson Township through Feb. 27.
- Continuing, motorists should expect daytime lane closures in both directions on Route 1 between the Kennett Oxford Bypass and Greenwood Road in Kennett and East Marlborough townships. The closures are to facilitate widening that 1.3-mile stretch of roadway to three lanes in both directions. Work is expected top continued through April 17.
- Intersection reconstruction will cause a full 24/7 closure of Bethel Avenue between Conchester Highway and Cherry Tree Road through late 2026. Detours to be posted.
- Road reconstruction will continue to cause lane shifts on Conchester Highway between Chelsea Parkway and Cherry Tree Road in Upper Chichester through Oct. 15.
- Roadway construction will cause daytime lane closures on Route 1 between the Kennett Oxford Bypass and Webb Barn Lane in East Marlborough and Kennett townships through April 24, 2026.
- Overhead utility construction will continue, causing daytime lane shifts on Route 1 between the Kennett Oxford Bypass and Walnut Street in Kennett Township.
- Kennett Square is reporting that the Birch Street Reconstruction Project is scheduled to end in the spring of 2026. During this time, Birch Street will experience rolling road closures where one or both lanes of traffic may be closed for a few hundred feet at a time. In general, the road will be open to local traffic, and road closures will be minimized as much as possible. When both lanes of traffic need to be closed for construction activities, access will be available on both sides of Birch Street, from South Broad Street and South Walnut Street.
Road Report February 16 – 27 Read More »

• 
