July 5, 2019

Excessive heat warning in effect until 7 p.m. Saturday

The national weather service in Mount Holly has issued an excessive heat warning, which is in effect until 7:00 p.m. Saturday.

Heat index values will be around 100 into early this evening, and again on Saturday afternoon.

Temperatures highs today and Saturday will be near 90 degrees. Lows tonight in the middle and upper 70s.

The heat and humidity will create a hazard for those who spend an extended amount of time out of doors during the heat of the day. Also, the heat and humidity may cause problems for the elderly, especially for those who do not have access to air conditioning.

Precautionary/preparedness actions:

Take extra precautions if you work or spend time outside. When possible, reschedule strenuous activities to the early morning or late evening. Know the signs and symptoms of heat exhaustion and heat stroke. Wear light weight and loose fitting clothing, and drink plenty of water.

To reduce your risk while working outdoors, the occupational safety and health administration recommends scheduling frequent rest breaks in a shaded or air conditioned environment. Anyone overcome by heat should be moved to a cool and shaded location. Heat stroke is an emergency, call 9 1 1.

An excessive heat warning means that a prolonged period of dangerously hot and humid conditions will occur. The combination of heat and humidity will create a dangerous situation in which heat illnesses are likely. Drink plenty of fluids, stay in an air-conditioned location, stay out of the sun, and check on elderly relatives and neighbors.

Young children and pets should never be left unattended in a vehicle under any circumstance. This is especially true during warm or hot weather when a car’s interior can reach lethal temperatures in a matter of minutes.

About CFLive Staff

See Contributors Page https://chaddsfordlive.com/writers/

Excessive heat warning in effect until 7 p.m. Saturday Read More »

Roadwork for July 6-July 12

PennDOT has announced the following road projects, which are weather-dependent and could affect residents in the greater Chadds Ford area during the week of July 6-July 12. Motorists are urged to allow extra time if they are traveling through one of the construction zones. Work schedules are subject to change.

Motorists should expect lane restrictions due to utility work on Smithbridge Road, between Route 202 and leopard Run in Concord Township, from July 8 to July 19.

Road reconstruction will close Spring Valley Road— between Conchester Highway and Concord Road — in Concord Township through April 30, 2020. Detours will be posted.

West Chester Borough is planning a single lane closure next week from 8 p.m. to 6 a.m. the following morning on Gay Street at two locations for roadway repair. The work schedule is: Sunday, July 7, through Wednesday, July 10, between Matlack Street and Walnut Street, and Wednesday, July 10, through Friday, July 12, between High Street and Church Street.

Motorists should expect lane closures on High Street, between Washington and Chestnut — in West Chester through July 7.

Lane restrictions on the Conchester Highway, between Routes 1 and Clayton Park Drive will continue through Oct. 20, 2020 for reconstruction and widening.

Motorists will continue to encounter periodic lane closures on Route 1between Greenwood Road and Route 52 in Kennett Township through mid-August for overhead bridge repairs.

Weekday lane closures are planned for Route 41 — Gap Newport Road— between Newark Road and New Garden Road in New Garden Township through July for road work, part of a PennDOT Highway Occupancy Permit.

Alternating lane closures are scheduled next week on Route 202at the Pleasant Grove Road intersection in Westtown Township for temporary traffic signal installation. PennDOT is installing the temporary traffic signal to help alleviate congestion during construction of a new connector road between West Pleasant Grove Road and Stetson School Drive by the township. The temporary signal is expected to remain in place until the project’s completion in late August.

Barrier installation will cause lane closures on Brandywine Creek Road between Green Valley Road and Powell Road in Newlin Township through June 20.

About CFLive Staff

See Contributors Page https://chaddsfordlive.com/writers/

Roadwork for July 6-July 12 Read More »

Scroll to Top