Road Report for May 21 through May 27

PennDOT has announced the following road projects, which are weather-dependent and could affect drivers in the greater Chadds Ford area during the week of May 21 through May 27. Motorists are urged to allow extra time if traveling through one of the construction zones. Work schedules are subject to change.

Lane closures along Route 1 in Chadds Ford and Concord townships will continue at least through Thursday, May 26. Lane closures from Fairville Road to Route 202 will be in place overnight from 7 p.m. to 7 a.m. In Concord Township, closures will be between Pole Cat and Thornton roads and will run day and night, 24 hours per day.

Pipe trench patching will cause a closure of Brandywine Creek Road in Newlin Township on Monday, May 23 between 9 a.m. and 2 p.m. The closure will be between Powell and Green Valley roads. Brandywine Creek Road motorists will be directed to use Powell and Green Valley. Local access will be maintained during the operation.

Pole replacement will cause lane closures on Route 842 — Clonmell Upland Road — in West Marlborough Township through the end of June. The closure will be between Street and London Grove roads.

Utility work in West Chester will cause a daytime lane closure on High Street from May 23 through June 6.

Running through June 10, utility replacement will cause lane closures on Route 1 between Elmwood and Lenape roads in Kennett Township.

The Embreeville Road Bridge over the West Branch over the Brandywine Creek in Newlin Township remains closed because of the Sept. 1 flooding. The closure remains listed as indefinite.

About CFLive Staff

See Contributors Page https://chaddsfordlive.com/writers/

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading...

Comments

comments

Leave a Reply