Roadwork for June 23 – June 29

PennDOT has announced the following road projects, which are weather-dependent and could affect residents in the greater Chadds Ford area during the week of June 23 through June 29. Motorists are urged to allow extra time if they are traveling through one of the construction zones. Work schedules are subject to change.

• The bridge carrying Route 82 over the East Branch of Red Clay Creek in Kennett Township, is closed indefinitely due to serious deterioration of the beams. Route 82 will be closed near the intersection of Old Kennett Road until PennDOT bridge engineers can examine the damage and develop a plan to rehabilitate the structure.

• PECO is planning to close Gay Street weekdays between Matlack Street and High Street in West Chester, on Monday, June 25, through late August, from 7a.m. to 4 p.m., for utility installation. During the weekday closure, Gay Street motorists will be detoured over Matlack Street, Chestnut Street and High Street. Local access will be maintained up to the construction zone.

• Maintenance will cause lane restrictions on Westtown Road Monday, June 25, through Friday, July 6, between Five Points Road and Route 926 in West Goshen and Westtown townships, for base repair.

• Overnight lane restrictions are scheduled on Route 41 from the Delaware state line to the Route 1 Interchange in Avondale Borough and New Garden and London Grove townships, on Sunday, June 24, through Thursday, June 28, for paving operations.

• Periodic lane restrictions continue through Oct. 20, on Conchester Highway, between Route 1 and Foulk Road, in Concord Township.

• Spring Valley Road in Concord Township, between Fellowship Road and Conchester Highway, will be closed and detoured between June 26 and Sept. 28.

• Utility installation will cause lane restrictions on Thornton Road in Concord Township beginning May 1 through June 29. Work between Trimble Road and Colonial Circle is expected to continue through Aug. 2.

• Utility installation will also cause lane restrictions on Thornton Road between Colonial  Circle and Aldan Road through June 29.

• Utility installation will cause lane closures between E. Baltimore Pike and Cope Road on Millers Hill in Kennett Township beginning June 21 through June 28.

• Expect lane restrictions on Price Street, between S. Wayne and S. Bradford streets, in West Chester for utility installation through Aug. 10.

• Bridge rehabilitation will cause the closing of Pocopson Road — between Street and Parkersville roads — in Pocopson and Pennsbury townships through Sept. 1.

• Barrier installation continues to cause indefinite lane closures on Brandywine Creek Road, between Green Valley and Powell roads, in Newlin Township.

• Utility installation will cause lane closures on Llewellyn Road, between Lenni and Valleybrook roads in Concord Township, from June 18-25.

• Station Road, between Concord Road and Conchester Highway, in Concord Township, is closed through Oct. 20, for road construction. Detours are posted. Station Road will also be closed between Conchester Highway and Partridge Lane through June 30.

• Sunoco Pipeline has closed Route 352 at Boot Road in East Goshen Township, for pipe installation. The restriction is only for trucks traveling south and turning onto Boot Road. The daily closure will remain in effect through late December.

About CFLive Staff

See Contributors Page https://chaddsfordlive.com/writers/

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading...

Comments

comments

Leave a Reply