Roadwork for March 18 through March 24

PennDOT has announced the following road projects, which are weather-dependent and could affect residents in the greater Chadds Ford area during the week of March 18 through March 25. Motorists are urged to allow extra time if they are traveling through one of the construction zones.

• Beginning Monday, March 20, through Friday, March 24, from 9 a.m. to 3 p.m., Route 322 (Conchester Highway) motorists will encounter single lane conditions between Route 1 and Evergreen Drive for clearing operations.

• There will also be periodic lane restrictions on Route 322 between Route 1 and Clayton Park Drive from March 20 through Oct. 20 as part of the reconstruction and road widening of Route 322.

• Test drilling will cause lane restrictions on two roads in Concord Township on March 16 and 17. Roads involved are Route 202 between Smithbridge and Beaver Valley Road, and Smithbridge Road between Route 202 and Feldspar Drive.

• There will be lane restrictions on northbound Route 1 between Old Baltimore Pike and Ponds Edge Drive in Pennsbury Township from 9 a.m. to 3 p.m. through March 31 for utility installation.

• Utility installation will cause lane restrictions on Price Street in West Chester through March 28.

• Utility installation will also cause lane restrictions on East Marshall Street in West Chester through April 7.

• There will be lane closures on East South Street in Kennett Square between Hornblende Avenue and Garner Way, weekdays, 9 a.m. to 3 p.m., through March 20.

• On Monday, March 20 and Tuesday, March 21, from 7 a.m. to 3 p.m., lane restrictions are scheduled on Newark Road between Airport Way and Rose Hill Lane in New Garden Township, for tree removal operations.

• The Route 926 Bridge remains closed through Sept. 1. Motorists should follow detours using Routes 1 and 52.

• Green Valley Road, between Powell and Brandywine Creek roads, in Newlin Township, remains closed for bridge repair. Detours are posted.

• Route 82 in East Fallowfield Township, between Valley and Strasburg roads, remains closed for bridge rehabilitation through June 21.

About CFLive Staff

See Contributors Page https://chaddsfordlive.com/writers/

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading...

Comments

comments

Leave a Reply