Roadwork for week of Oct. 22

PennDOT has announced the following road projects which are weather-dependent and could affect residents in the greater Chadds Ford area during the week of Oct. 22 through Oct. 29. Motorists are urged to allow extra time if they are traveling through one of the construction zones.

Drivers on Route 100 southbound in West Goshen Township will experience lane restrictions for patching. Crews will be working from 9 a.m. to 3 p.m. from Route 202 and 30 from Monday, Oct. 24, through Wednesday, Oct. 26.

Also in West Goshen Township, a lane closure will be in effect on Boot Road between Route 202 and Phoenixville Pike through Nov. 23. Crews will be conducting pipeline maintenance from 9 a.m. to 3 p.m.

After a five-year closure, the historic Speakman Covered Bridge in East Fallowfield and West Marlborough townships reopened this past week.

Green Valley Road in Newlin Township is closed and detoured between Powell and Brandywine Creek roads due to structural deficiencies at the Green Valley Road Bridge. No repair date has been scheduled.

Burnt Mill Road in Kennett Township remains closed and detoured for reconstruction between Norway and Spring Mill roads. The estimated completion date is Dec. 20.

Route 30 westbound in West Whiteland Township will be the scene of a fuel spill cleanup on Wednesday, Oct. 26. The right lane will be closed between Route 100 and Quarry Road from 9 a.m. to 3 p.m.

Utility installation on East Market Street in West Chester Borough will require lane restrictions at Franklin Street. The work is scheduled from 9 a.m. to 3 p.m., Tuesday, Oct. 25, through Tuesday, Nov. 1.

Stargazers Village has closed Strasburg Road between Sunset Drive and Stargazer Road in West Bradford Township through Monday, Oct. 31 for the construction of a roundabout. Crews are scheduled to work from 7 a.m. to 7 p.m., and detours are posted.

The shoulder of I-476 in both directions will continued to be closed between I-76 and I-95 for fiber optic cable installation. The work is scheduled from Sunday, Oct. 23, through Sunday, Oct. 30; crews will be working from 9 a.m. to 3 p.m.

A shoulder closure is scheduled on northbound I-95 in Tinicum Township between Routes 420 and 291 to install foundation. The work will be done Sunday, Oct. 23, through Sunday, Oct. 30, from midnight to 5 a.m.

Lane restrictions are scheduled next week in Philadelphia and Delaware County for the installation of Intelligent Transportation System (ITS) components. On Sunday, Oct. 23, through Sunday, Oct. 30, from midnight to 5 a.m., the right lane will be closed on I-95 north between Route 420 and Bartram Avenue for the installation of overhead sign foundations and signs; on the same dates from 9 a.m. to 3 p.m., lane closures are scheduled on Broad Street between Pattison Avenue and 11th Street in Philadelphia for the installation of travel time readers and electrical conduits; and from midnight to 5 a.m., the right lane will be closed on I-76 west between Penrose Avenue and Mifflin Street in Philadelphia for overhead message board installation.

If you want to report potholes and other roadway maintenance concerns on state roads, call 610-566-0972 in Delaware County or 484-340-3200 in Chester County, or visit www.dot.state.pa.us and click on “submit feedback.”

 

 

About CFLive Staff

See Contributors Page https://chaddsfordlive.com/writers/

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading...

Comments

comments

Leave a Reply