Roadwork for week of Sept. 10

PennDOT has announced the following road projects, which are weather-dependent and could affect residents in the greater Chadds Ford area during the week of Sept. 10 through Sept. 17. Motorists are urged to allow extra time if they are traveling through one of the construction zones.

Drivers on Route 202 in Birmingham Township will experience lane restrictions in both directions between Brinton’s Bridge Road and Route 322. Crews are scheduled to work from 9 a.m. to 2 p.m. on Monday, Sept. 12, and Tuesday, Sept. 13, on sweeping and cleaning islands and shoulders.

Also on Route 202, southbound drivers in Westtown Township will find lane restrictions between Garden Circle and Ridge Road from 9 a.m. to 3 p.m. on Wednesday, Sept. 14, through Friday, Sept. 16. Crews will be working on utility installation.

Fiber optic cable installation will result in overnight lane closures on southbound Route 202 in East Whiteland Township. Crews are scheduled on Friday, Sept. 9, and Saturday, Sept. 10, from 8 p.m. to 10 a.m. Lane restrictions will be needed near the Route 252 interchange on Saturday, Sept. 10, from 5 to 10 a.m., from 5 to 9 a.m. on Sunday, Sept. 11; and on Saturday, Sept. 17, from 5 to 9 a.m.

Motorists on Route 1 in Kennett and East Marlborough townships will continue to experience overnight delays between Baltimore Pike and Greenwood Road on Sunday, Sept. 11, through Thursday, Sept. 15. Crews will be milling and paving from 8 p.m. to 5 a.m.

Route 322 in both directions in Concord, Bethel and Upper Chichester townships will be the site of lane closures for patching. Crews will be working between I-95 and Route 1 from 9 a.m. to 3 p.m. on Wednesday, Sept. 14.

Patching will result in intermittent lane closures on I-95 between the Delaware state line and Philadelphia County. The work is scheduled from 9 a.m. to 3 p.m. on Tuesday, Sept. 13, on the northbound side, and on Thursday, Sept. 15, from 9 a.m. to 3 p.m. for southbound motorists.

Work will continue on the Speakman Covered Bridge in East Fallowfield and West Marlborough townships. Frog Hollow Road between Concord Bridge and Strasburg roads will be closed and detoured until the estimated completion date of Sept. 20.

Green Valley Road in Newlin Township is closed and detoured between Powell and Brandywine Creek roads due to structural deficiencies at the Green Valley Road Bridge. No repair date has been scheduled.

Burnt Mill Road in Kennett Township remains closed and detoured between Norway and Spring Mill roads while advance work continues

Work is continuing on the Birmingham Road Bridge in Birmingham Township, which was closed in September 2015 due to structural damage. Posted 24-hour detours will be in effect between Lambourne Road and Stoney Run Drive through Friday, Sept. 16.

Utility installation on West Miner Street in West Chester Borough will require lane restrictions at South Bradford Avenue. The work is scheduled from 9 a.m. to 3 p.m. on Monday, Sept. 12, and Tuesday, Sept. 13.

If you want to report potholes and other roadway maintenance concerns on state roads, call 610-566-0972 in Delaware County or 484-340-3200 in Chester County, or visit www.dot.state.pa.us and click on “submit feedback.”

 

 

About CFLive Staff

See Contributors Page https://chaddsfordlive.com/writers/

1 Star2 Stars3 Stars4 Stars5 Stars (1 votes, average: 5.00 out of 5)
Loading...

Comments

comments

Leave a Reply