Roadwork for week of May 31

PennDOT has announced the following road projects, which are weather-dependent and could affect residents in the greater Chadds Ford area during the week of May 31 through June 7. The department recommends that motorists allow extra time if they are traveling through one of the construction zones.

Drivers on Route 1 in both directions will experience lane restrictions between Newark Road and East Baltimore Pike in Kennett and New Garden townships for guide rail installation. Crews are scheduled to work from Monday, June 1, through Friday, June 5.

On Route 202 in Concord and Chadds Ford townships, lane closures will continue to be needed for roadwork in connection with the Wegmans shopping center between Applied Card Way and Route 1 from 9 a.m. to 3 p.m. and 7 p.m. to 6 a.m. through Oct. 1

On Route 1 in Concord Township, lane closures will be needed in both directions between Brinton Lake Road and Route 202 from 9 a.m. to 3 p.m. and 7 p.m. to 6 a.m. through Oct. 1. On southbound Route 1, 24-hour lane closures will be needed between Thornton and Conchester roads for work scheduled through July 7.

Motorists on Boot Road in West Goshen Township will experience lane restrictions between Clover Mill Road and National Road through July 31. Crews will be working on road-widening from 9 a.m. to 3 p.m.

Traffic signal installation in Kennett Square Borough will continue to require lane closures on Cypress Street at Mill Road, Meredith Street and South Broad Street; Union Street at South Street; and State Street at Broad Street, Union Street and Mill Road. Crews are scheduled to work from 7 a.m. to 3:30 p.m. on Monday, June 1, through Friday, June 5.

Burnt Mill Road in Kennett Township is closed and detoured between Norway and Spring Mill roads indefinitely while crews prepare for repairs to a bridge that collapsed on April 24.

Crack sealing will necessitate intermittent lane closures on Route 3 in both directions in Willistown, Westtown, East Goshen and West Goshen townships. The work is scheduled between Matlack Street and Delchester Road from 8 a.m. to 2 p.m. on Monday, June 1, through Friday, June 5.

Intermittent lane closures are scheduled on Route 30 (the Exton Bypass) in both directions between Route 202 and the Lancaster County line from Monday, June 1, through Thursday, June 4, in West Whiteland, West Sadsbury, Valley, Caln and East Caln townships. The street-sweeping work will be done from 9 a.m. to 2:30 p.m.

Route 100 will continue to be restricted to one lane in both directions between Sunrise Drive and Route 113 in Uwchlan and West Whiteland townships, from Monday, June 1, through Friday, June 5, from 9 a.m. to 3 p.m. for road widening.

The right lane will be closed on northbound Interstate 95 between the Walt Whitman Bridge and Washington Avenue in Philadelphia on Monday, June 1, through Wednesday, June 3, from 8 p.m. to 5 a.m. for bridge deck sealing. In addition, the right lane will be closed on southbound I-95 between Washington Avenue and the Walt Whitman Bridge on Thursday, June 4, from 8 p.m. to 5 a.m.

One lane will remain closed on Interstate 95 North at the Commodore Barry Bridge for construction through July 14.

If you want to report potholes and other roadway maintenance concerns on state roads, call 610-566-0972 in Delaware County or 484-340-3200 in Chester County, or visit www.dot.state.pa.us and click on “submit feedback.”.

 

About CFLive Staff

See Contributors Page https://chaddsfordlive.com/writers/

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading...

Comments

comments

Leave a Reply